Guide ยท Commercial roofing

Energy efficiency and sustainability on commercial roofs

How insulation, reflective surfaces, planted roofs and solar panels change a commercial roof, and what each asks of the structure beneath it.

The roof is the largest surface on most commercial buildings that faces the weather, and what lies in it decides how much heat the building keeps in winter and takes in during summer. That makes it the natural place to look when energy bills rise or a landlord, a lender or a customer asks about the building's performance. The options are varied: more insulation, a reflective finish, a planted layer or panels that generate electricity. Each one changes the roof in ways that go beyond the energy figure. It may add weight, alter the drainage, create new penetrations or complicate later repairs. This guide describes the main upgrades without trade jargon, says which suit which kinds of building, and flags the points that need an engineer, building control or the planning authority before work starts. It is general guidance on a subject where the particular roof matters, and a survey settles the rest.

Where a commercial roof gains and loses heat

Heat leaves a building most readily through the surfaces that are largest and least insulated, and an old commercial roof frequently is both. A single-skin metal roof with a thin lining, a flat roof with a few millimetres of old insulation board, or a pitched roof with a poorly filled void will all let warmth escape in winter. In summer the same roofs can let in heat, particularly dark membranes and sheets on a top-floor office or a lightweight unit with no shading.

Gaps cause losses as well as thin layers. Air that leaks around rooflights, plant penetrations, eaves and ridge details carries heat with it, and damp insulation conducts heat far better than dry. Wet insulation is common under a roof that has leaked slowly for a long time, so a leak and an energy problem are often the same problem. A roof that has been repaired many times is a good candidate for a proper look at what lies beneath the covering.

That is why we treat energy upgrades as part of a roof's future, not a separate project. The best moment to improve a roof's thermal performance is when the covering is being renewed, because the layers are open and the cost of access is shared. Adding insulation to a roof you are about to strip anyway is much cheaper than retrofitting it later. Doing it after a new covering has gone on usually means lifting that covering, which nobody wants.

Not every building needs the same answer. A cold store, a showroom, a school hall and a warehouse have different heating and cooling loads, so the upgrade that pays back in one can be wasted in another. We start from how the building is used.

Insulation upgrades: warm roofs and the build-up beneath

The most direct improvement is more insulation, and on a flat roof the usual way to provide it is a warm roof. Rigid boards are laid over the deck, a vapour control layer sits beneath them, and the waterproof covering goes on top. Because the insulation lies above the structure, the deck stays warmer and condensation inside the roof is less likely. Our guide to commercial roof systems describes where that fits among the other build-ups.

Tapered insulation is a useful variant. Boards cut to a slope can create or improve the fall to the outlets while adding thermal value, which helps a roof that holds water. Done well, one operation solves two problems.

Insulation brings consequences. It raises the roof height at edges, parapets, thresholds and rooflight upstands, so those details are rebuilt. It adds weight, though modest. And it changes the way the roof behaves in a fire, so the board and covering chosen need to suit the building. For metal-sheet roofs, upgrading may mean over-roofing with a new insulated layer rather than lifting the old sheets, a technique we cover in our guide to overlay systems.

On any roof where the covering is replaced, Planning Portal guidance for re-roofing warns that the thermal element may have to be brought up to standard. A building control approver, or the council's own building control, can say which standard applies to a non-domestic building, and the question belongs at the survey stage, not after the job. A small repair stays below the threshold, since approval is aimed at work touching under 25 per cent of the envelope and under 50 per cent of the roof.

Cool roofs and reflective finishes

A cool roof reflects more sunlight than a conventional dark surface, so less heat passes through into the building. The effect comes from the colour and finish of the outer layer: a light-coloured membrane, a reflective coating on a metal or felt roof, or pale mineral chippings. In a building that overheats, such as a top-floor office, a studio or a lightweight unit with large glazed areas, the aim is to reduce the load on the cooling system.

The benefit is greatest where summer overheating is the issue and least where winter heating dominates, because a reflective surface cannot warm a building. Whether a cool finish suits your premises therefore depends on the pattern of use. A building heated most of the year may gain little, while one with year-round cooling demands may gain more. We do not quote a saving, because it depends on the building, the glazing, the hours of use and the existing insulation.

Coatings deserve a separate word. A liquid-applied coating can extend the life of a sound roof and add reflectivity at the same time, but it only works on a roof that is dry, clean and sound. It cannot repair a failing deck or reverse wet insulation. Our answer on whether a commercial roof can be coated instead of replaced sets out the conditions.

Dirt matters too. A light roof that grows algae, collects soot or is covered in debris loses its reflectivity, so a cool roof is another reason for regular cleaning. Upkeep of that sort is the subject of our planned maintenance guide.

Green roofs: planted layers on flat commercial roofs

A green roof adds a growing layer above the waterproofing: a root barrier, a drainage layer, a growing medium and plants. The simplest kind uses shallow substrate and hardy sedum, and needs little care. Deeper, more varied planting is heavier and needs regular attention, including irrigation in dry weather.

The reasons for choosing one are varied. A planted roof slows rainwater leaving the building, adds a layer of cover over the membrane, can provide habitat and gives an insulating effect, although the amount varies with substrate depth and moisture. For a building under planning pressure to manage drainage or biodiversity, it can be a requirement of the scheme rather than an option.

It also brings real demands. The structure must carry the weight of the layers, wet as well as dry, and an engineer should confirm that before anything is ordered. Any new covering that makes the roof 15 per cent or more heavier brings in building control and a structural check, and a green roof on an existing building rarely escapes that. The waterproofing beneath must be sound and root-resistant, because replacing it later means lifting the whole system. Outlets need protected inspection chambers, and the edges need gravel strips to keep plants and soil away from the upstands.

Maintenance continues for the life of the roof. Weeds and saplings need removing, drainage must be kept clear, and any repair to the waterproofing starts with taking the planting up. For that reason a green roof is best specified on a new or fully stripped roof, not laid over an old covering of uncertain condition. Our wider guide to green roofs covers the technology on domestic buildings.

Solar panels on commercial roofs

Panels let a roof generate electricity, and a large commercial roof offers plenty of space for them. Whether they work on a particular roof turns on four things: the strength of the structure, the condition and life of the covering, the orientation and shade, and the route for cables into the building. Our short answer on whether a commercial roof can take solar panels covers the first checks.

The covering matters more than many owners expect. Panels sit on the roof for a long time, and taking them off to replace a worn membrane means paying for a second visit. If the covering has only a few years left, it makes sense to renew it first and fit the panels on top. Mounting methods differ with the roof type. On a flat roof they may sit on ballasted frames, which add weight, or on fixings through the membrane, which need careful waterproofing. On a metal roof clamps grip the seams or ribs without drilling through the sheet. On a pitched roof, hooks pass under the tiles or slates.

Every fixing is a potential leak point and every cable run is a new penetration. We detail those with the same care as a chimney flashing, and record where they are, so that later repair work does not damage them. The roof also needs safe walkways and edge protection for the people who install and clean the panels.

Insurers and mortgage lenders may have views, so tell them. For listed buildings and conservation areas, B&NES planning should be asked before any plan is drawn up, because the appearance of panels can matter there more than the electrical output.

Rainwater, rooflights and the smaller measures

Not every improvement is a big one. Replacing old rooflights with insulated units brings daylight in and reduces heat loss at the same time. Failed or yellowed rooflights, particularly the single-skin kind, lose heat and let in less light. We cover when to renew them in our answer on industrial rooflight replacement, and the safety rules for working near old ones are in our guide to fragile roof safety.

Draught-proofing at eaves, ridges and service penetrations is inexpensive and effective. Sealing the gaps around pipes, flues and plant bases reduces the loss of warm air and helps keep insulation dry. Ventilation, by contrast, needs to be kept where the design calls for it. A cold-roof void without the air paths it was designed with can collect moisture, so insulation work must not block them.

Rainwater harvesting is another option: the roof drains to a tank, and the water is used for flushing, washing vehicles or irrigation. It places a premium on clean gutters and a covering that does not shed harmful residues, and the system needs filtration and overflow arrangements. It is worth considering where the building uses a lot of non-drinking water.

Finally, think about what becomes of the covering when its time is up. Choosing a material that can be repaired, re-used or recycled makes later work easier and keeps waste out of skips. That is a useful question to ask about any covering, and our comparison of commercial roofing materials gives the lifespans to weigh it against.

Cost, consent and where to begin

Energy projects vary so much that a single figure would mislead. The cost depends on the roof's size, the insulation chosen, the access, any structural work and the covering that goes on top. No commercial roof is priced from a list, and our guide to commercial roofing costs explains what moves the figure and what the published ranges can and cannot tell you. Your fixed price follows the survey.

Consent comes in layers. Building control looks at the thermal performance and the structure, and our answer on whether a commercial re-roof needs Building Regulations approval sets out the thresholds. A registered building control approver or the council can advise on a non-domestic building. Planning is a separate matter for panels, plant and green roofs, and in Bath it also covers the heritage designations, so put a scheme for any protected building to B&NES first.

To begin, we survey the roof, photograph the layers, test the insulation where we can and list the options in order of value. If the best step is a repair and a thorough clean, we tell you so. If the covering has reached the point where insulation and renewal should go together, that is how we price it. Whatever the scope, the work carries our 10-year written workmanship guarantee, and the wider range of business roof work is set out on our commercial roofing page.

Questions

Commercial roof energy upgrades: follow-up questions

Should insulation be improved before or after fitting solar panels to a commercial roof?

Before. Insulation is laid under the covering, so adding it later means lifting the panels and the covering together. Doing the build-up first, then the waterproofing, then the panels, keeps each layer accessible and avoids paying for the same access twice.

Will a green roof on an older commercial building need the structure checked first?

Yes. A planted roof is heavy when the substrate is wet, and the existing frame was probably never sized to carry it. An engineer should assess the loading before a scheme is priced, and building control should be told if the new covering is significantly heavier than the old.

Is a reflective coating worth it on a building that is mostly heated?

Often it is less useful there. A reflective surface cuts summer heat gain but cannot add warmth in winter, so benefit depends on whether cooling or heating dominates. A coating can still extend the life of a sound roof, so judge it on that as well.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey