Answer ยท Commercial roofing

Can commercial roofing be done in winter?

Much of it can, provided the deck is dry and the system suits the conditions. Some materials cure or bond badly in cold, damp air and are best held back.

The short answer

Commercial roofing can be done in winter, but the system decides how easily. Mechanically fixed metal sheet and many single-ply membranes go down in cold weather if the deck is dry, while resin, adhesive and some bitumen systems need warmth and dry surfaces to cure or bond. Wet decks, frost and high wind stop work for any system, so a winter programme allows for lost days.

What winter does to a roof job

A roof is built outdoors, so the weather is part of the specification. Three conditions matter most in winter. Moisture on the deck is the first, because trapped water under a new waterproof layer turns to vapour, blisters the covering and wets the insulation. Low temperature is the second, since adhesives, sealants, resins and bitumen all behave differently when cold. Wind is the third, and it is not confined to winter, although the season brings more of it: a large sheet of membrane or metal catches wind like a sail and cannot be handled safely above a certain strength of gust.

The point of all this is not that winter work is poor work. It is that each system has conditions it will tolerate, set by the manufacturer, and a good contractor keeps within them. A cut corner in January shows up as a failure in March.

If your existing roof is already leaking, waiting for spring may cost more than working through the cold. A temporary make-safe protects the building, and the permanent job can be programmed around the weather.

Systems that cope well with cold weather

Mechanically fixed systems are the most forgiving. Profiled metal sheeting is screwed to purlins and sealed at the laps, and while sealant likes a reasonable temperature, the structural work of fixing sheets does not depend on curing. Cold affects handling more than performance, because sheets are slippery in frost and need careful access control. Our page on single-ply roofing covers the sheet membranes, which are fixed mechanically or ballasted, then joined at the seams by hot-air welding. Welding can continue in cold weather where the surfaces are dry, with the installer adjusting settings for the conditions and testing the seams.

Sheet lead is another material that tolerates winter work. It is laid dry, shaped by hand and fixed with clips, with no cure time to worry about. Lead is also cold to work with, but it does not depend on temperature to perform.

In all of these, the limiting factor is a dry deck and a dry working surface, not the thermometer alone.

Systems that prefer warmth and dry air

Anything that sets chemically or bonds with an adhesive needs more care. GRP, the glass-reinforced plastic laid as resin over a deck, hardens through a reaction that runs slowly when it is cold and goes wrong if damp gets in. A bad cure leaves a surface that looks fine and fails early. Liquid-applied coatings behave in a similar way, and each product data sheet states the temperature and moisture limits for application and cure.

Torch-on felt and built-up felt are laid by heating the underside of the sheet so that it fuses to the layer below. In cold air the fusion can be patchy, and moisture trapped under the felt shows later as blisters. Fully adhered single-ply membranes use glues that depend on dry, warm surfaces. EPDM is often glued down this way on small flat roofs, and a damp deck at the wrong time of year undermines it.

None of this rules these systems out between October and March. It means the work is timed to a spell of dry weather, a section is completed and covered each day, and any part not yet watertight is protected. Our guide to built-up felt roofing explains how the layers are fused together.

Keeping a business running through a winter job

A winter programme leans on phasing. Rather than strip the whole roof in one go, the work is divided into bays or sections, each one stripped, renewed and closed up before the next is touched. When the forecast worsens, the open section is sealed with temporary cover and the crew returns once conditions improve. This protects stock and equipment inside and keeps the building in use.

Daylight is shorter in winter, so the working day is shorter too, and the programme should reflect that rather than promise a summer pace. Cold and wet also slow access, because ladders, scaffold boards and sheet surfaces take more care when slippery. Safety on roofs is not something we bend to the calendar, and fragile surfaces need particular attention, as our page on fragile roof safety explains.

The practical advice is to ask for a programme that shows contingency days, a clear note of what is temporarily covered when the crew leaves, and who decides when conditions are too poor to proceed.

Deciding between winter work and waiting

The right answer depends on the state of the roof. If water is getting in and damaging stock or fabric, make it safe now and settle the permanent work with the weather in mind. If the roof is tired but not leaking, there may be value in surveying in autumn, agreeing the scope over winter and starting in the first dry spell of spring, when planning, approval and materials are all in place.

Approval may also affect the date. Larger re-roofs can be notifiable, and building control needs notice before work begins; our answer on Building Regulations for a commercial re-roof explains. Cost can shift with the season too, and the commercial roof cost page covers what drives it. When the question is whether to patch through the winter or renew, the decision rules on repairing or replacing a commercial roof will help.

Book the survey, which costs nothing, and the written fixed price that follows lets you choose your timing on facts. See also our commercial roofing overview.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey