Guide ยท Commercial roofing

Commercial roofs on listed buildings in Bath's centre

A listed shop, office or hotel in central Bath still needs a dry roof. This guide explains how repairs are made without stepping outside what the building's consent allows.

Central Bath is full of commercial premises that sit inside listed buildings: shops on the ground floor of a Georgian terrace, offices in converted townhouses, restaurants and hotels behind stone frontages. The roofs above them were built for houses, and they carry the details of houses: slate laid in diminishing courses, lead-lined valleys and parapet gutters, tall stone chimney stacks, dormers set into mansards. When one of these roofs starts to leak, the owner has two problems at once. The water has to be stopped, and the repair has to stay within what the listing permits. Around 5,000 buildings in Bath are listed, so many owners are in the same position. This guide explains what is likely to need consent and what may not, how the usual defects are put right, and how to plan the job so that trading is disturbed as little as possible. It is part of our commercial roofing work in and around the city.

What the listing covers on a commercial building

The protection attaches to the entire structure and is not limited to the street elevation. The roof is part of the protected fabric whether or not anyone can see it from the pavement, and the entry for a building describes its special interest broadly rather than itemising each slope. For a shop or office, that means the use inside has no bearing on the roof above: it is treated as the roof of a listed building.

So any alteration that affects the roof's special character calls for listed building consent, which B&NES Council grants and which is distinct from planning consent. The council's advice to owners is to get in touch before work begins, and it warns that unconsented work can lead to prosecution. This is not a technicality for commercial owners. Lenders, buyers and tenants all ask about it, and an unconsented alteration can sit as a problem on a title for years.

Two place-based points can apply to the same address. Bath is a World Heritage Site throughout, while the conservation area takes in around half of it, so a premises can be both listed and in the conservation area, which adds another layer of scrutiny to changes in appearance. Separately, some streets are subject to Article 4 directions that remove permitted development rights. The council says their aim is to protect special areas, the World Heritage Site among them, yet its own examples are porches, joinery, paintwork and sheds, with roofs absent from the list. That is another reason to ask the council about a particular address, not to assume.

The practical rule we apply is that anything that changes how the roof looks or is made needs a conversation with the council first, and anything that reproduces what is there is much more likely to be treated as repair.

Repair, which usually needs no consent, and alteration, which does

The line between the two is not drawn by cost or size. It is drawn by whether the work matches the existing fabric and method or changes them. Replacing a handful of slipped slates with natural slate of the same size, colour and laying pattern is generally a repair. Stripping a whole roof and recovering it in a different material is an alteration. Between those ends lie many cases that deserve a call to the conservation officer.

Typical examples of work treated as alteration:

  • A change of covering. Natural slate replaced by artificial slate, or stone tiles by concrete.
  • A change of detail. A lead valley replaced by a different material, or a ridge converted to a different type.
  • New openings. Rooflights, roof access hatches and plant penetrations.
  • Fixings and equipment. Solar panels, antennae, extract flues and fall-arrest anchors.
  • Structural change. Raising a parapet, rebuilding a chimney in a new form, or altering the line of a dormer.

The Bath Preservation Trust's comments on individual applications show the tone expected. On a terrace at Lambridge Place, with its mansard and built-in dormers, the Trust favoured natural Welsh slate in place of an artificial one. In the Grade I St James's Square case it backed fresh lead for the valley gutters and the removal of the asbestos slates. These are casework examples, not published policy, but they show that like-for-like and better-matched work is welcomed, and that substitutions are scrutinised.

If you are unsure, ask. B&NES lists a conservation contact on its listed buildings pages, and a brief email with photographs and a description of the intended repair normally clarifies where your job falls. We can help prepare that description from our survey.

Slate, stone and lead: matching what is there

Matching starts with identifying the covering. On older Bath roofs this may be natural Welsh slate, clay tiles, or stone slates, sometimes in combination on different slopes of one building. The St James's Square case mentioned above records Welsh slate on the main pitch and clay pantiles on a rear slope. It is a reminder that a single roof can hold more than one material and that each is repaired in its own terms.

For slate, matching means the right size, thickness, colour and texture, laid to the existing gauge. Courses on many older roofs shrink steadily upward, larger pieces at the eaves and the smallest by the ridge, and a repair that ignores this pattern stands out. Where the original slate cannot be matched with new stock, salvaged slate from a similar roof is the usual answer. The nails count for as much as the slate. Iron and weakly galvanised nails rust through and let slates slide, so copper or another non-corroding nail is specified, and why a roof dotted with slipped slates is often a nail problem rather than a slate problem.

Lead is the other main material. Valleys, parapet gutters, flashings and hip rolls are all lead on a traditional roof. A parapet gutter is the lead-covered channel running behind a stone parapet, taking roof water to an outlet or downpipe. A box gutter is a similar trough, sitting between slopes or against a wall. Lead is graded by code, which describes its thickness. Code 4 is used for flashings and pitched valleys, while codes 5 to 8 suit parapet and box gutters, with the heavier codes for larger or more exposed runs. Long runs need drips at intervals to accommodate expansion, and cover flashings must be wedged into the wall joints. Skimping on any of these causes the split that opens a year or two later.

Mortar is the quiet third item. On chimneys and parapets, lime mortar allows the old stone to breathe. The Trust has criticised cement pointing and flaunching on a listed building at Walcot Buildings, noting that cement may have worsened the damage to the stone. We use lime for stone repointing and flaunching on listed work.

Valleys, parapets and box gutters on town-centre buildings

The roofs that cause the most trouble for commercial owners in the centre are the ones with hidden drainage. A building that fronts a street often has its roof set back behind a parapet, with the rainwater collected in a lead gutter that is invisible from the ground. When that lead fails, the leak appears in a ceiling of an upper floor, or in a shop display months later, and the roof looks sound from every angle that matters.

The usual causes are repeated. Lead splits at laps and drips where it has moved with the temperature. Outlets block with leaves and silt, and the gutter overflows into the building. Old repairs in bitumen or sealant crack, and the original lead beneath is thinner than it should be. We work through the gutter from end to end, noting each failure, the fall of the lead and the condition of the timber beneath, because wet boarding below the lead means the defect is older than the visible stain.

Repair choices vary. A narrow split can be dealt with by removing the damaged strip and dressing in new lead. A lining beyond economic repair is relaid in new lead to the correct code, with the falls corrected, new drips and a fresh outlet. In listed buildings the aim is to keep lead as the material, since a switch to a membrane would change the character of the roof and would need agreement.

Access is the practical hurdle. Parapet gutters in a tight terrace can only be reached from inside the roof space, from a ladder over a neighbour's yard or from scaffold in a public street. A scaffold on a public pavement is subject to highway permissions, and that affects both cost and timing. We plan access and the pavement arrangements as part of the survey and name them in the quote.

Flat and low-pitched areas on listed commercial buildings

Listed commercial buildings often have a flat area somewhere: the roof of a rear extension, a link between two buildings, an infill roof to a yard, or a flat section hidden behind a parapet. These are rarely original, and they are the roofs that tend to be replaced most often.

The consent question depends on whether the flat roof is visible from outside, whether it forms part of the listed fabric or a later addition, and what is proposed. A like-for-like renewal of a hidden flat roof is much less sensitive than a change to the roof of an important elevation. Even so, the council will want to know if the roof edge, the upstand to a historic wall or the junction with a stone parapet is being altered.

Where felt, single-ply or lead is chosen, the junction with the stone is what matters. Cutting a chase into a historic wall for a cover flashing is a modest change if done properly in lime mortar, but a damaging one if done with cement and a grinder. We prefer to reuse existing joints, and we flag where a new chase is unavoidable. Our guide to overlaying commercial roofs explains why putting a fresh membrane on top of the old one is attractive in principle, but on a listed building the extra weight and the change in edge height need checking before it is chosen.

Rooflights are a particular case. A roof window or rooflight on a listed building needs consent, and the Planning Portal permitted development rules that apply to some houses do not extend to listed buildings. We do not repeat those rules here, and anyone considering a new opening should ask the council first.

Planning the job around trading and consent

With a shop, a restaurant or an office beneath, the roof programme has to work around the people using the building. That includes noise, access through the premises, protection of stock and furniture, and fire safety where hot work is involved.

The sequence we suggest is straightforward. First, a survey records the roof and the defects with photographs. Second, a short description of the proposed repair is prepared, with sketches or photographs where useful, and shared with the council if there is any doubt about consent. Third, once the position is clear, a fixed price is given in writing and a start date agreed that fits trading. Fourth, the work is carried out in sections, each made watertight before the day ends. Last, the premises are left clear and the waste leaves with us.

If the building is let, check the lease. The responsibility for the roof may sit with the landlord, the tenant or both, depending on the repairing covenants, and the cost may be passed through a service charge. Our guide to commercial lease roof repairs goes into who normally pays, and for blocks with residential flats above shops the guide on section 20 roof works covers the consultation process.

In an emergency the first step is a temporary cover or patch that stops the water, recorded with photographs. It is a stopgap, and we describe it as one. The permanent repair then follows the route above, with consent sought if it is required.

The workmanship on our repairs carries a 10-year written guarantee, and it is set out in the quote, not in small print afterwards.

Questions

Listed commercial roofs: practical questions

Does patching a leaking lead gutter on a listed shop need consent?

A small like-for-like patch in lead normally counts as repair, not alteration, but whether it does depends on the extent and the listing, so ask the B&NES conservation team when in doubt. Replacing the lead with another material is a change, and at that stage consent is almost certainly required.

Can a listed building's slate roof be re-covered in a cheaper man-made slate?

Not safely without asking. Swapping natural slate for artificial slate alters the appearance and weathering of the roof, and the Bath Preservation Trust has supported the reverse on at least one terrace, replacing artificial slate with natural Welsh. Raise the proposal with the council before pricing it.

Who has to deal with the council when the shop is rented?

The consent applicant is usually the owner or someone acting for them, and a tenant may need the landlord's agreement under the lease. Confirm who is responsible for the roof first. A roofer can supply the survey photographs and the description of the repair, which is most of what the council asks to see.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey