Answer ยท Commercial roofing

What do schools and community buildings need from a roofer?

A roof over a classroom or a village hall is repaired around children, staff and volunteers. The way the site is run matters as much as the roofing.

The short answer

Schools and community buildings need a roofer who works around safeguarding rules, programmes the job to the school or hall calendar, and keeps people well away from the work. That means agreed site access, fenced work areas, deliveries timed outside busy periods, and a clear plan for asbestos records and emergency leaks. The roof repair itself is the easy part.

Safeguarding and who is on site

A school sets its own rules about who may be on its premises, and a roofer should expect to follow them. The governing body or the headteacher decides what checks, identification and supervision are needed, and those rules can differ between a primary school, a secondary school, a nursery and a village hall used by a playgroup. Ask for them in writing before the job and brief everyone who will attend site.

The practical side is simple. Workers sign in and out, wear identification and keep to the route agreed with the school. Nobody speaks to pupils or wanders into the building. Phones and cameras are kept away from areas where children are present, and photographs taken for the survey are of the roof and not of anyone below. If a worker needs to enter the building, for example to reach a loft hatch, the school arranges an escort and a time.

Community buildings such as church halls, scout huts and parish halls have the same concerns on a smaller scale. Whoever runs the building, whether a committee, a trust or a parish council, decides the rules, and groups meeting there should be told when work is happening.

Programming around the school calendar

The best time for large work is when the building is empty. School holidays are the obvious window, and the summer break is the longest, but it is also the busiest time for school contractors, so planning needs to start months ahead. Half-term and the Christmas and Easter breaks suit smaller jobs. For a village hall, the quiet weeks in the booking diary may be the answer.

Leaks do not follow the calendar. A roof that starts to drip in January cannot wait for August. A dripping ceiling or a storm-stripped slope gets seen to ahead of planned jobs, and a stopgap to keep water out can hold a classroom in use until the permanent repair fits the school's diary. That might mean sealing a failed section, clearing a blocked outlet or covering an exposed area. Afterwards we put the permanent repair on a programme that the school agrees.

Plan the lead time too. Funding approval, governors' meetings, tender requirements and notice to parents all take time. If the repair is part of a planned programme of maintenance, see our answer on the roof maintenance contract, which sets out how regular visits spot problems before they interrupt lessons.

Site safety with children and the public nearby

The safest approach keeps the work area and the people area apart. That means fencing or hoarding around the working zone, a protected route for pupils where it passes under or beside it, and scaffold that cannot be climbed. Materials are stored behind the fence and never left where children can reach them. Ladders are removed or secured at the end of each day. Tools and hot works equipment are locked away.

Deliveries are timed to avoid drop-off and pick-up. Lorries and cranes reverse only with a banksman. Dust, noise and fumes are controlled, and torches and other hot works are used only with the school's knowledge, away from any chance of fire reaching occupied rooms. Where a roof has fragile lights or old asbestos-cement sheets, nobody goes near it without the proper protection, as our guide to fragile roof safety sets out.

Asbestos deserves a special mention. Many school buildings from certain decades contain it somewhere, and schools keep a record of where. The roofer should read that record before touching anything, and should stop and report if they find a material that is not on it. See our answer on asbestos on an industrial roof.

Flat roofs, old halls and listed buildings

Many school and hall roofs are flat or low-pitched, from 1960s and 1970s extensions to modern link blocks. Typical problems are ponding, split felt and failed upstands at rooflights and plant. The principles in our answer on shop roof repair apply here as well, with extra care over noise, smells and who is nearby.

Older village halls and chapels bring different questions. A Victorian school building may have natural slate with lead valleys and a parapet gutter, and the matching of materials matters. Where the building is listed, B&NES Council is the body to ask about consent. Churches in use are different: for Church of England buildings, the diocese grants a faculty rather than the council giving consent. A hall that is separate from the church, or a converted chapel now used by the community, may not share that exemption, so ask before you start.

Old halls with open eaves appeal to bats and nesting birds, and both are protected in law. If there is any sign of either, stop and ask for advice before the work begins.

Records, planning and a regular check

A school or hall gains a good deal from keeping the roof file up to date. Keep the survey, the photographs, the invoice for the work, any product warranties and the plans in one place, and pass them on when the caretaker or chair changes. Trustees and governors should be able to see at once when the roof was last looked at and what it needs next.

A planned check is cheaper than an emergency. Gutters and outlets silt up with leaves and moss, and on a flat roof one blocked outlet will fill a roof like a bath. Our page on commercial roof maintenance describes what a routine visit covers.

Commercial and community roofs are priced on survey. The report comes with pictures from your roof, and the fixed figure is confirmed on paper. For a school, we can programme the noisiest stripping for half term and the holidays. For other types of premises, the commercial roofing hub is a good place to start.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey