The short answer
Possibly, but never assume so. On a protected building, swapping lead for GRP, zinc, a lead-free membrane or any other substitute is a change to the fabric that normally needs the council's agreement first, and lead is the traditional material that officers expect to see kept. Ask B&NES before work starts, since carrying out unauthorised work is an offence.
Why the material matters on a listed roof
Listing protects a building for what it is as a whole: its structure, its materials, its appearance and the way it was put together. The roof is part of that. Lead on a historic roof is more than a waterproof layer. It is the traditional answer to gutters, valleys, flats and the junctions around chimneys, and it has been used in this way on stone buildings for centuries.
A substitute is therefore not judged only on whether it keeps water out. The officer weighs up its appearance, how it weathers, how it is jointed and fixed, and what it does to the fabric around it. A grey-white lead gutter behind a stone parapet has a certain finish and edge detail. A moulded fibreglass gutter in the same spot may have a different sheen, different joints and a different profile, even when it is painted to match.
None of this means a substitute can never be accepted. It means the decision belongs to the council, which weighs it case by case, and not to the roofer or the owner. For Bath, that council is B&NES, whose planning service deals with listed building consent.
What the council says to do
The council is clear about the first step: speak to its planners before anything is done. Its guidance on B&NES listed buildings draws a line between listed building consent and a planning application, which are different permissions, and warns that going ahead without authority is a criminal matter.
In practice that means a short email or call to the conservation team describing the roof, the part involved and the material you are thinking of. Photographs help, and a survey with pictures of the lead you want to change is useful evidence of its condition. The reply should tell you whether consent is required and what paperwork the council would expect.
It is better to ask before you obtain a price than after. A quote based on a material that the council will not accept wastes time for everyone, and work done in an unapproved material may have to be reversed.
Like for like usually starts the conversation
Replacing lead with new lead of a suitable code, in the same form, is the starting point most owners are steered towards. That route preserves the roof's appearance and uses a material with a long track record. On many listed roofs, repair and re-leading is how the building has always been maintained. On one Grade I address in Bath, the Bath Preservation Trust supported fresh lead in the valley gutters.
The council, not the roofer, decides what counts as like for like, so an owner who simply wants the same again should still ask. Minor repairs in the same material may be treated differently from a complete relay, and a different lead code, a change of fixing method or a new gutter profile can all be questions in their own right.
The tests that usually apply are set out in our listed leadwork guide, and our patination page explains how new lead is brought to a finish that sits alongside the old.
Why owners ask about alternatives at all
The questions we hear tend to come from two directions. One is theft. Roof lead is valuable scrap, and a building that has lost its lead more than once may be a case for a substitute that is worth little to a thief. The other is cost and weight, since lead is heavy and a large gutter relined in lead is a considerable bill.
Theft deserves to be put to the council clearly. If lead has been stolen before, say so, and show the evidence, because that history can bear on what is acceptable. What stolen lead does to a building is described on our page for replacing stolen lead, including the repairs that follow.
For the alternatives themselves, a comparison of GRP, zinc and lead-free flashing is on our lead alternatives page. Whatever you choose, expect to be asked about the finish, the joints and the lifespan, since each affects how the roof ages beside the original fabric.
Places where the rules differ
Listed buildings are not all treated the same way. A church of the Church of England in use is covered by the ecclesiastical exemption, which means a faculty from the diocese covers such work, so the council is not the body that consents. A redundant church or a converted chapel that is now a house is not exempt, and goes back to the council route.
A building in a conservation area that is not itself listed has fewer constraints on interior work but the roof can still matter if it is seen from the street. Some streets in Bath have Article 4 directions that remove certain permitted development rights; the examples B&NES gives include porches, windows, doors, painting and sheds, and its policy map shows whether any individual street is affected.
If you are not sure which category your building falls into, the survey will tell us, and we will point you to the right desk. Related questions, such as how a hidden gutter is reached and cleared, are covered on our page about clearing parapet gutters, and one common source of trouble is on the valley leak page. Our full lead roofing service also takes on protected roofs across the city and its neighbouring towns.