Answer ยท Garage roofs

Can a garage roof be replaced in winter?

Often, yes. The limit is not the calendar but the day: a garage roof needs a dry deck and a still, workable spell, and some coverings tolerate cold far better than others.

The short answer

A garage roof can go on in winter, provided the job is timed to suit the weather. Sheet and tile roofs are fairly forgiving, while felt, EPDM and fibreglass flat roofs need a dry deck and suitable temperatures. A short run of dry days matters more than the month, and a leaking roof can be made safe first and renewed when conditions allow.

Why the weather matters more than the month

People assume roofing stops from November to March. In practice a good run of settled days in January can be a better time to work than a showery week in May. What a roofer needs is a dry surface, manageable wind and a plan for the hours when the covering is open to the sky.

A garage is a small roof, which helps. A single garage can often be stripped and covered within a short spell, and the exposed time is brief compared with a house. That does not remove the risk: a sudden shower on an open deck soaks insulation and timber, and a wet deck sealed under a new membrane traps moisture that will cause trouble for years.

So the question to ask any roofer is not whether they work in winter, but how they decide when to start and what they do if the forecast turns. A sensible answer includes checking the deck for moisture, sheeting over the exposed area before leaving site each evening, and a readiness to postpone.

How each covering behaves in the cold

Coverings differ a great deal in how well they cope. The comparison below is practical rather than technical, and your roofer should confirm the details for the product on your garage.

  • Profiled metal sheet. Sheets are bolted down with no wet trades involved, so cold is less of a problem. Wind is the main hazard, since large sheets act like sails when lifted.
  • Tiles and slate. Pitched coverings go on course by course and can be covered quickly if rain arrives. Frost on a surface makes working at height risky, but the materials are not temperature sensitive.
  • EPDM rubber. The membrane is laid in one piece and glued to the deck, and adhesives have working limits. The deck must be dry, and cold or damp can stop the work.
  • GRP fibreglass. Its resin hardens through a reaction that drags in low temperatures and goes wrong in damp, so this is the covering most dependent on the weather.
  • Felt and torch-on. A dry deck is essential, and layers should not be laid over frost or standing water.

How much of the job each covering needs in dry weather also feeds into the schedule, and our page on how long a garage roof replacement takes shows how a job is paced.

Dealing with a leak before the right weather arrives

A roof that is already leaking cannot always wait for a perfect week. A garage already letting water in gets our attention ahead of routine jobs, and the first step on a failing garage roof is often a make-safe: a temporary cover, a patch or a sealed opening that keeps water out until a full replacement is possible. That protects the contents, the walls and the structure, and it keeps the cost of the final job from climbing with every wet night.

A make-safe is a stopgap and not the finish. Repairs done in poor conditions are not designed to last, and we would rather you knew that. The aim is to buy time for a proper job in a workable spell, whether that comes next week or in early spring.

If you are not sure how urgent your own roof is, look for water marks that are spreading, drips during rain, sagging sheets and a damp smell. They suggest acting soon. A roof that merely looks old and has stayed dry can be planned for spring.

Other things that change in winter

Light is shorter, so working days are shorter, and a job that would take a morning in summer can need more careful pacing. Ladders and scaffolds need extra checking on wet or icy ground, and nobody should work on a frosted roof surface. Wind that is only a nuisance at ground level can be dangerous on an open roof, particularly with sheets.

Materials matter too. Timber that has been stored in the rain should dry out before it is covered over, and sealants and adhesives have a working range that is printed on the tin. Good roofers read it.

Because bats and nesting birds enjoy legal protection, check the roof void before stripping begins, whatever the season. Winter is, if anything, easier on that point than spring.

Planning, paperwork and booking

Winter does not change the rules. If the garage has a listing or a conservation setting, consent has to be in place first, and Building Regulations may apply to a full re-roof. Our page on garage roof planning permission explains where to check. The same goes for any shed or workshop of similar construction, covered in our note on the outbuilding roof.

Booking starts with a survey. Ask for one, which is free from us, and we photograph your garage roof so you can see what we see. A fixed price is written down once we have seen it, and any job that proceeds is guaranteed for ten years on workmanship, in a document you keep.

If the weather turns on the planned day, we move it rather than force the work, and we tell you up front why. The wider job is set out under garage roof replacement, and the sensible time to start the conversation is when you first notice a problem, not when the forecast has already turned.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey