Terraces that step down the hill
A roof that finishes against a taller wall asks more of its waterproofing than one that runs free.
Walk along a street in Oldfield Park on a slope and the roofs descend like stairs. At every step, the party wall between two houses stands up above the roof beside it, and the junction between wall and slope has to be sealed. On older terraces, that seal is lead dressed into the stone in a series of steps, called stepped flashing, so that each section of the wall has its own small strip of metal overlapping the next.
It is a good detail when it is sound and a troublesome one when it is not. Lead moves with the temperature, and it can work loose from its chase, the narrow groove cut in the masonry to hold the top edge. Mortar that holds the lead in place cracks and falls out. Water then slips behind the flashing and runs inside the wall, and the first sign of it is a brown stain on a bedroom ceiling or the party wall plaster in the loft.
Fixing it begins with finding which piece has failed. Sometimes a single step has lifted and a local repair is enough. Where the lead is thin, split or distorted along its length, replacing the whole run gives a longer-lasting result. We re-point the chase in a mortar suited to the wall, which means lime on Bath stone, and not just any mortar that will set.
Because the party wall is shared, the junction affects both houses. The survey photographs it from your side and records what we can see of the neighbouring slope, so that the information is usable if the owner next door needs to act. The wider work on this type of roof comes under pitched roofing.



