Answer ยท Flat roofing

Can a flat roof be laid in cold or wet weather?

Some coverings tolerate cold better than others, but none can be laid on a wet deck. The deciding factor is a dry substrate, not the calendar.

The short answer

A flat roof can be laid in winter, but only on days when the deck is dry and conditions suit the material. Every system needs a dry substrate. Resin-based GRP is the most sensitive to cold and damp, adhesives on EPDM need a dry surface, and torch-on felt has its own limits. A good roofer will stop, cover up and wait rather than lay over moisture.

The deck must be dry, whatever the season

Winter does not rule out roofing. What it rules out is laying on moisture. A covering sealed over a wet deck traps the water under it, and the trapped moisture becomes blisters, rot and a shortened life. Timber covered while damp may stay wet for a long while afterwards.

That is why the first question on any winter job is the state of the deck. The roofer checks it by eye and by hand, and at the right stage with a moisture meter, which gives a reading for the water in the wood. Dew, frost and drizzle all count. A deck that looks dry at noon can be damp again by mid-afternoon on a short winter day.

Sometimes the answer is to dry the deck with a short wait, and sometimes to cover it temporarily and return. The skill lies in knowing when to stop, and the pressure to keep going is the thing that causes failures.

How each covering copes with the cold

Manufacturers publish their own limits, and the instructions for the particular product are what a roofer must follow. In general terms, though, the materials behave quite differently.

GRP is the most weather-sensitive. The resin cures by a chemical reaction that slows in the cold and can fail altogether in damp conditions, leaving a soft or cloudy finish that never fully hardens. It generally needs dry, mild days, and an overnight frost can ruin a fresh lay.

EPDM is more forgiving. The sheet itself stays flexible in cold weather, so it can be unrolled and handled. The adhesive used to bond it to the deck, and the tapes at the joints, need a dry, clean surface and sensible temperatures, so the weather still dictates the pace.

Torch-on felt is applied with a gas flame, and cold decks and cold rolls make the bitumen harder to work. Damp matters here too, since steam driven out of a wet deck blisters the felt.

Lead and zinc are worked as sheet, and they are the least bothered by cold. Slippery surfaces and frost are a safety question for those on the roof.

What a roofer does when the weather turns

Weather is part of the job, and a competent firm plans for it. Work is scheduled in sections, so only as much roof is opened as can be made watertight the same day. Temporary covers, tarpaulins and sheeting protect the open deck. A roof is never left stripped overnight on a poor forecast.

If conditions change mid-job, the sensible response is to finish the section in hand, protect it and stop. Hurrying to beat the rain is how joints are left unsealed.

It is fair to ask a roofer how they handle wet or cold days, and what the plan is if a section cannot be completed. A vague reply tells you something too. At the survey we say what window is realistic for your roof and covering, and we move the start date, not the standard, when the weather does not allow work.

Emergency repairs are a different matter

A leaking roof in the middle of a wet winter cannot always wait for ideal conditions. Then the goal is a roof that is safe and sealed for now, which is a different job from a full relay.

A temporary repair might be a patch, a sealing compound or a protective cover over a damaged area. These can be done in less than ideal weather, but they are holding measures and not permanent ones. A proper repair follows when the weather and the deck allow it.

Storm damage and leaks are priorities for us. Stopping the water comes first, and the permanent repair is agreed with you afterwards. If the cause is a wet deck, it may need replacing before any new covering is laid, which is a good reason not to rush a final fix. To pin down the entry point, read about flat roof leaks and their usual causes.

Insurance, regulations and timing

Winter is also when storm damage claims arise, and the way a repair is recorded can matter. Take dated photographs before and after, and keep any report or invoice. Our page on flat roof insurance claims covers how insurers view leaks, including the distinction between sudden storm damage and wear and tear.

Regulations do not change with the season. A new or replaced covering may bring in Building Regulations if it goes beyond certain thresholds, and the thermal requirements apply whenever the work is done. Our guide to flat roof regulations sets out the thresholds.

Planning ahead is the cheapest way to avoid winter work. If a roof is clearly near the end of its life, surveying it in late summer or autumn gives time to book a replacement in settled weather.

Is winter a bad time to book a new roof

Not necessarily. Many flat roofs are relaid in winter without problems, because the deciding factor is dry days and not the date. What changes is the programme. A winter job may take longer than the same job in July, because days are shorter, fewer days are workable and sections are closed up carefully each evening.

If your roof is failing and water is getting in, waiting for spring can cost more in damage than a winter job costs in delay. A sound roof with work planned ahead can reasonably wait for a settled spell.

The survey is free, the fixed price is put in writing, and timing is discussed at the same visit. For the full range of work, see our flat roofing service page.

Get your free survey

Get your free roof survey

Tell us what's happening and we'll call you back to arrange a visit. Prefer to talk? Call 01225 285181.

  • Photos of your own roof
  • A fixed price in writing
  • 10-year workmanship guarantee
Call Free survey