Working on the slopes below Castle Hill
Where the ground tilts, the access plan is half the job, and a good one saves time and keeps the site safe.
The steep slope of Castle Hill rises from the north-western side of Mere, and on rising ground like this a house that is two storeys at the front may stand three at the back, and a roof that is easy to reach on one side may need a high scaffold on the other. Those facts shape the price before any slate is touched.
We start with the access. A scaffold on level ground goes up quickly and sits square; on a slope it has to be stepped, braced and tied to the building at each lift, and it needs firm footing at every leg. A cheaper alternative, used for small repairs, is a roof ladder or crawling boards, which spread the load across the slope and give a safe position. Neither is a route to be improvised, so the survey records how the roof will be reached and where the materials will be set down.
The second matter is water. A roof above a steep garden sheds its run-off onto ground that falls away, and the foot of the wall can take the splash. A sound gutter sends the water down the pipe and into the drain. A blocked or slipped one lets the wall below take the full flow. When we survey a house on a slope, we follow the water to the ground and note where it ends up.
The third matter is time on the roof. On a pitch that is hard to stand on, even routine repairs take longer, and our quotation allows for that, not for the optimistic case. Faults that cannot wait, leaks included, are covered under roof repairs, where the first step is always to make the roof safe. When the work ends we clear the site and carry the waste off.



